RECOMMENDATION:
Staff recommends the Planning Commission adopt the Director's analysis and findings and APPROVE the requested Special Use Permit. The permit would allow the development of marijuana retail, cultivation, and on-site consumption at 10011 Glacier Highway in an Industrial Zone.
The approval is subject to the following conditions:
Condition #1: Before issuance of a Building Permit, the applicant will provide CBJ Public Works’ Utilities Engineer with information on anticipated wastewater flows, including quantity and quality. Written approval of the project from the Utilities Engineer is required.
Condition #2: Prior to issuance of a Temporary Certificate of Occupancy, wheel stops shall be placed in the parking lot to define the location of parking spaces.
Condition #3: Prior to issuance of a Temporary Certificate of Occupancy, CBJ-approved signage shall be posted for the accessible parking space prior to commencement of the proposed use.
Condition #4: Prior to issuance of a Temporary Certificate of Occupancy, all pavement markings, including directional arrows, parking space stripes, and other markings shown on the project site plan, shall be applied to the parking and circulation area as shown on the site plan in a medium designed for such purposes.
Condition #5: Before issuance of a Temporary Certificate of Occupancy, required signage includes:
-
“Smoking in Designated Areas Only” at the entrance to the facility.
-
“No Smoking” signs in the retail and cultivation areas.
-
“Designated Smoking Area Entrance” on the entrance to the consumption area.
-
“Exiting Designated Smoking Area” on exits from the consumption area.
Signage will be clear and legible.
|